Búsqueda avanzada

MOHAMMAD KHALILZADEH

MOHAMMAD KHALILZADEH

MOHAMMAD KHALILZADEH

Doctor of Philosophy, sharif university of technology

DOCENTE CONTRATADO - CONTRATADO
Tiempo parcial por asignaturas (TPA)
Departamento Académico Posgrado en Negocios - Sección Posgrado en Negocios

Publicaciones

Se encontraron 34 publicaciones

BANIHASHEMI, S. A.; KHALILZADEH, M.; KAZIMIERAS, E.; Antucheviciene, J.(2021). Investigating the Environmental Impacts of Construction Projects in Time-Cost Trade-Off Project Scheduling Problems with CoCoSo Multi-Criteria Decision-Making Method. Sustainability. Recuperado de: https://www.mdpi.com/2071-1050/13/19/10922
Kebriyaii, O.; Heidari, A.; KHALILZADEH, M.; Antucheviciene, J.; Pavlovskis, M.(2021). Application of Three Metaheuristic Algorithms to Time-Cost-Quality Trade-Off Project Scheduling Problem for Construction Projects Considering Time Value of Money. Symmetry. Recuperado de: https://www.mdpi.com/2073-8994/13/12/2402
Naghizadeh, A.; Ansari, R.; KHALILZADEH, M.; Antucheviciene, J.; Bausys, R.(2021). An Integrated Decision Support Model Based on BWM and Fuzzy-VIKOR Techniques for Contractor Selection in Construction Projects. Sustainability. Recuperado de: https://www.mdpi.com/2071-1050/13/12/6933
Kebriyaii, O.; Hamzeheio, M.; KHALILZADEH, M.(2021). A disaster relief commodity supply chain network considering emergency relief volunteers: a case study. Journal of Humanitarian Logistics and Supply Chain Management.
BANIHASHEMI, S. A. y KHALILZADEH, M.(2021). Evaluating efficiency in construction projects with the TOPSIS model and NDEA method considering undesirable data. Iranian Journal of Science and Technology - Transactions of Civil Engineering. Recuperado de: https://link.springer.com/article/10.1007/s40996-021-00669-w
Shakeri, H.; KHALILZADEH, M.; Raslanas, S.; Kazimieras, E.(2020). What do project managers need to know to succeed in face-to-face communication?. ECONOMIC RESEARCH-EKONOMSKA ISTRA¿IVANJA. Recuperado de: https://doi.org/10.1080/1331677X.2020.1819851
BANIHASHEMI, S. A. y KHALILZADEH, M.(2020). Time-cost-quality-environmental impact trade-off resource-constrained project scheduling problem with DEA approach. Engineering, Construction and Architectural Management.
KHALILZADEH, M.; Karami, A.; Hajikhani, A.(2020). The multi-objective supplier selection problem with fuzzy parameters and solving the order allocation problem with coverage. Journal of Modelling in Management. Recuperado de: http://http://dx.doi.org/10.1108/JM2-04-2018-0049